{"id":8635,"date":"2026-09-02T08:19:04","date_gmt":"2026-09-02T08:19:04","guid":{"rendered":"https:\/\/www.toolmateshire.com.au\/blog\/how-to-install-a-2-pipe-hydronic-heating-system-rough-in-steps-and-best-practices\/"},"modified":"2026-09-02T08:19:04","modified_gmt":"2026-09-02T08:19:04","slug":"how-to-install-a-2-pipe-hydronic-heating-system-rough-in-steps-and-best-practices","status":"publish","type":"post","link":"https:\/\/www.toolmateshire.com.au\/blog\/how-to-install-a-2-pipe-hydronic-heating-system-rough-in-steps-and-best-practices\/","title":{"rendered":"How to Install a 2-Pipe Hydronic Heating System: Rough-In Steps and Best Practices"},"content":{"rendered":"<p>A 2-pipe hydronic system circulates heated water through one pipe to radiators or radiant panels, then returns cooled water through a separate pipe back to the boiler. This configuration gives you independent temperature control at each zone and delivers even heat distribution across your entire building, making it the preferred choice for residential and light commercial installations where comfort and efficiency matter.<\/p>\n<p>Unlike a 1-pipe system where supply and return water mix at each heating element, the 2-pipe design maintains consistent supply temperature throughout the loop. That means every radiator receives water at the same temperature, eliminating the cool spots you&#8217;d find at the end of a single-pipe run. Professional installers favor this system because it&#8217;s straightforward to balance, easier to troubleshoot, and adapts well to multi-zone layouts.<\/p>\n<p>Getting the <a href=\"https:\/\/www.toolmateshire.com.au\/blog\/how-hydronic-heating-rough-in-sets-up-your-system-for-success\/\">hydronic rough-in<\/a> right during construction sets the foundation for decades of reliable heating. You&#8217;ll need a solid grasp of pipe sizing, proper pitch requirements, and strategic placement of supply and return mains. The installation itself demands attention to detail: every joint must be leak-free, every hanger properly spaced, and every valve accessible for future maintenance.<\/p>\n<p>This guide walks you through the complete installation process, from initial layout and material selection to pressure testing and system commissioning. Whether you&#8217;re a tradie tackling your first hydronic job or a confident DIYer upgrading your home heating, you&#8217;ll find the practical steps and pro tips needed to install a 2-pipe system that performs flawlessly from day one.<\/p>\n<h2>What You&#8217;ll Need: Tools, Materials, and Equipment<\/h2>\n<p>Before you start cutting pipe or making connections, gather everything you&#8217;ll need to avoid mid-project trips to the supply house. A 2-pipe hydronic rough-in demands specialized equipment alongside basic plumbing tools, and knowing what to rent versus purchase can save hundreds of dollars.<\/p>\n<p><strong>Essential Tools<\/strong><\/p>\n<ul>\n<li>Pipe cutter or reciprocating saw with metal-cutting blade for clean, square cuts<\/li>\n<li>Pipe threader (rental recommended unless installing multiple systems) for creating threaded connections on steel pipe<\/li>\n<li>Deburring tool or reamer to smooth cut edges and prevent restrictions<\/li>\n<li>Propane or MAP gas torch with striker for soldering copper joints<\/li>\n<li>Tubing cutter and PEX expansion tool if using PEX-A piping<\/li>\n<li>Spirit level to verify proper pitch throughout the system<\/li>\n<li>Measuring tape, pencil, and chalk line for accurate layout<\/li>\n<li>Adjustable wrenches and pipe wrenches (10-inch and 14-inch sizes cover most fittings)<\/li>\n<li>Drill with appropriate bits for hanger installation in joists or studs<\/li>\n<li>Pressure testing gauge and pump (often available as rental package)<\/li>\n<\/ul>\n<p>The pipe threader represents your biggest tool investment decision. Renting runs $40-75 per day from most equipment rental centers, which makes sense for a single project. Purchasing a manual threader starts around $200 but only pays off if you&#8217;re planning multiple installations or professional work.<\/p>\n<p><strong>Required Materials<\/strong><\/p>\n<p>Your material list depends on pipe type, but count on needing pipe (copper, steel, or PEX), fittings (elbows, tees, couplings, reducers), pipe hangers spaced per code (typically every 6-8 feet for horizontal runs), isolation valves at each zone, air vents at high points, drain valves at low points, pipe insulation rated for your operating temperature, Teflon tape or pipe dope for threaded connections, and solder with flux for copper systems. Don&#8217;t forget expansion tanks and fill valves, though these often come during the final hookup phase rather than rough-in.<\/p>\n<p>Purchase materials with a 10% overage on pipe and fittings. You&#8217;ll make mistakes, and driving back for a single elbow wastes more time than the extra cost.<\/p>\n<h2>Safety First: Critical Warnings and Precautions<\/h2>\n<p>Before you cut a single pipe or fire up a torch, understand that hydronic system installation involves real hazards. Working with open flames, pressurized water, and electrical components requires strict safety protocols to protect yourself and future occupants.<\/p>\n<p>When soldering copper pipe, you&#8217;ll use a propane or MAPP gas torch that produces an open flame hot enough to melt metal. Always keep a fire extinguisher within arm&#8217;s reach, and never solder near combustible materials like wood framing, insulation, or stored materials without a flame-resistant barrier. Work in a well-ventilated area, flux fumes and combustion byproducts can cause respiratory irritation in confined spaces. Remove all flammable debris from your work area, and let joints cool completely before moving to the next connection. Don&#8217;t rush: a dropped torch or premature movement can ignite surrounding materials.<\/p>\n<div class=\"callout callout-warning\"><strong>Warning:<\/strong> Most jurisdictions require permits for hydronic system installation, and pressure testing must follow local code specifications, never exceed rated pressures or test an unsupported system.<\/div>\n<p>Pressure testing introduces another set of risks. You&#8217;ll typically test at 1.5 times the system&#8217;s operating pressure, which means a sudden pipe failure can release water with enough force to cause injury. Always use approved hydronic fittings rated for your test pressure, secure all pipes with proper hangers before testing, and never stand directly in line with joints during pressurization. Wear safety glasses throughout the process.<\/p>\n<p>If you&#8217;re installing circulators or zone valves, you&#8217;re dealing with 120V or 240V electrical connections. Turn off power at the breaker, verify it&#8217;s off with a voltage tester, and follow National Electrical Code requirements for wet locations. Don&#8217;t assume the boiler area stays dry, hydronic systems can leak, and water plus electricity creates electrocution risk.<\/p>\n<p>Finally, familiarize yourself with your local building code requirements before starting. Codes dictate everything from pipe materials and hanger spacing to expansion tank sizing and backflow prevention. An inspector will verify compliance, and corrections after drywall installation cost far more than getting it right during rough-in.<\/p>\n<h2>Understanding 2-Pipe System Design Basics<\/h2>\n<figure class=\"wp-block-image size-large\">\n        <img loading=\"lazy\" decoding=\"async\" width=\"900\" height=\"514\" src=\"https:\/\/www.toolmateshire.com.au\/wp-content\/uploads\/2026\/09\/hydronic-boiler-room-supply-return-piping.jpeg\" alt=\"Hydronic boiler room showing copper supply and return piping, valves, insulation\" class =\"wp-image-8631\" srcset=\"https:\/\/www.toolmateshire.com.au\/wp-content\/uploads\/2026\/09\/hydronic-boiler-room-supply-return-piping.jpeg 900w, https:\ \www.toolmateshire.com.au\wp-content\uploads\2026\09\hydronic-boiler-room-supply-return-piping-300x171.jpeg300w, hydronic-boiler-room-supply-return-piping-768x439.jpeg 768w,hydronic-boiler-room-supply-return-piping-800x457.jpeg800w\"sizes=\"auto,(max-width:900px)100vw,900px\"><figcaption>A clear view of a boiler room highlights how supply and return piping are arranged in a real installation.<\/figcaption><\/figure>\n<h3>Supply and Return Line Fundamentals<\/h3>\n<figure class=\"wp-block-image size-large\">\n        <img loading=\"lazy\" decoding=\"async\" width=\"900\" height=\"514\" src=\"https:\/\/www.toolmateshire.com.au\/wp-content\/uploads\/2026\/09\/two-pipe-supply-return-side-by-side.jpeg\" alt=\"Supply and return copper pipes running side-by-side with insulation in a basement ceiling\" class=\"wp-image-8632\" srcset=\"https:\/\/www.toolmateshire.com.au\/wp-content\/uploads\/2026\/09\/two-pipe-supply-return-side-by-side.jpeg 900w, https:\\www.toolmateshire.com.au\wp-content\uploads\2026\09\two-pipe-supply-return-side-by-side-300x171.jpeg 300w, two-pipe-supply-return-side-by-side-768x439.jpeg768w,two-pipe-supply-return-side-by-side-800x457.jpeg800w\"sizes=\"auto,(max-width:900px)100vw, 900px\"><figcaption>Side-by-side supply and return piping visually conveys the balanced two-line distribution approach used in 2-pipe hydronic systems.<\/figcaption><\/figure>\n<p>A 2-pipe hydronic system creates two distinct pathways for water movement. Hot water leaves your boiler at its peak temperature, typically 65-82\u00b0C, and travels through the supply line to your heating units. These units might be baseboards, panel radiators, fan coils, or <a href=\"https:\/\/www.toolmateshire.com.au\/blog\/how-hydronic-radiant-floor-heating-in-concrete-slabs-keeps-your-home-warm-from-the-ground-up\/\">radiant floor<\/a> loops. As water passes through each unit, it releases heat into your space and cools down, usually dropping 8-14\u00b0C depending on the heating load.<\/p>\n<p>The cooled water then enters a separate return line that carries it back to the boiler for reheating. This dedicated return path is the defining feature of a 2-pipe design. Unlike single-pipe systems where water flows through units in sequence (getting progressively cooler), the 2-pipe arrangement delivers consistent supply temperature to every heating unit. Each unit receives roughly the same water temperature, which means more balanced heat distribution throughout your home and easier system balancing during commissioning.<\/p>\n<h3>Reverse-Return vs. Direct-Return Layout<\/h3>\n<p>In a 2-pipe hydronic system, you&#8217;ll need to choose between two fundamental piping layouts: direct-return and reverse-return. This decision affects system balance, installation effort, and long-term performance.<\/p>\n<p><strong>Direct-return<\/strong> is the simpler approach. Supply pipes branch out to each heating unit in sequence, and return pipes come back to the boiler along the shortest path. The first heating unit on the supply line is also the first to return water to the boiler. This creates an inherent imbalance: units closest to the boiler have the shortest total circuit length and receive the most flow, while distant units face greater resistance and may underperform. You&#8217;ll typically need manual balancing valves at each unit to restrict flow to closer units and equalize the system. Installation is straightforward, you&#8217;re essentially running two parallel pipes in the same direction.<\/p>\n<p><strong>Reverse-return<\/strong> solves the balancing problem through clever routing. The supply line still branches sequentially to each unit, but the return line reverses direction. The first unit on the supply becomes the last on the return, and vice versa. This equalizes the total pipe length for every circuit, creating self-balancing flow without constant adjustment. The trade-off? You&#8217;ll use more pipe and fittings, face higher material costs, and spend more time routing that longer return line through your rough-in. For systems with multiple zones or heating units spread across significant distances, reverse-return eliminates the headache of seasonal rebalancing and delivers consistent comfort throughout the building.<\/p>\n<h2>Step-by-Step Rough-In Installation Process<\/h2>\n<h3>Step 1: Plan Your Layout and Mark Pipe Routes<\/h3>\n<p>Start by walking the entire heating area with your plans and measuring tape. Map where each radiator, baseboard, or panel will sit, then trace the most efficient route for both supply and return lines back to the boiler location. For a direct-return configuration, the return path mirrors the supply route. For reverse-return layouts, the return line runs past all heating units in the opposite direction before heading back to the boiler, which naturally balances flow.<\/p>\n<p>Mark your pipe routes directly on joists and studs using a thick marker or chalk line. All horizontal runs need a minimum pitch of one-quarter inch per ten feet, sloping toward the boiler or designated <a href=\"https:\/\/www.toolmateshire.com.au\/blog\/what-dwv-actually-means-in-plumbing-and-why-it-matters-for-your-home\/\">drain points<\/a> to prevent air pockets and enable complete drainage during service. Use a level to verify this pitch at regular intervals along your marked route, especially where pipes change direction or transition between floor levels.<\/p>\n<p>Plan expansion room wherever pipes cross building components or make long straight runs. Metal pipe expands roughly one inch per hundred feet when heated from room temperature to operating range. Mark expansion loop locations or identify where you&#8217;ll install flexible connections. This forethought during <a href=\"https:\/\/www.toolmateshire.com.au\/blog\/how-hydronic-heating-rough-in-sets-up-your-system-for-success\/\">system setup<\/a> prevents buckled pipes and noisy operation later.<\/p>\n<p>Mark hanger positions at proper intervals: every four feet for half-inch copper, six feet for three-quarter inch, and eight feet for one-inch or larger steel pipe. Stagger marks slightly between supply and return runs to avoid crowding when both lines travel parallel through the same joist bay.<\/p>\n<h3>Step 2: Install Pipe Hangers and Supports<\/h3>\n<figure class=\"wp-block-image size-large\">\n        <img loading=\"lazy\" decoding=\"async\" width=\"900\" height=\"514\" src=\"https:\/\/www.toolmateshire.com.au\/wp-content\/uploads\/2026\/09\/pipe-hangers-on-joists-hydronic.jpeg\" alt=\"Pipe hangers secured to wood joists supporting hydronic supply and return piping\" class=\"wp-image-8633\" srcset=\"https:\/\/www.toolmateshire.com.au\/wp-content\/uploads\/2026\/09\/pipe-hangers-on-joists-hydronic.jpeg 900w, https:\\www.toolmateshire.com.au\wp-content\uploads\2026\09\pipe-hangers-on-joists-hydronic-300x171.jpeg 300w, pipe-hangers-on-joists-hydronic-768x439.jpeg768w,pipe-hangers-on-joists-hydronic-800x457.jpeg800w\"sizes=\"auto,(max-width:900px)100vw, 900px\"><figcaption>Proper support and hanger placement helps keep hydronic piping secure and correctly aligned through the rough-in stage.<\/figcaption><\/figure>\n<p>Pipe hangers must support the weight of water-filled lines while allowing for thermal movement. For copper pipe up to 1 inch, space hangers every 6 feet on horizontal runs; 1.25-inch and larger pipe needs support every 8 feet. Steel pipe requires closer spacing, every 8 feet for sizes up to 1.5 inches, and every 10 feet for 2-inch pipe. Vertical runs need hangers at every floor level.<\/p>\n<p>Secure hangers directly to joists, studs, or structural beams using appropriately sized lag screws or through-bolts. Avoid drywall anchors or ceiling furring strips, they won&#8217;t handle the load. Clevis hangers work well for horizontal copper runs, while riser clamps suit vertical sections.<\/p>\n<p>Leave 1\/8 inch of play at each hanger to accommodate expansion and contraction as the system heats and cools. Rigid clamping creates stress points that can crack joints or cause pipe failure. Near boilers and other heat sources, install hangers with rubber or plastic inserts to reduce noise transmission and vibration.<\/p>\n<h3>Step 3: Cut and Prepare Pipe Sections<\/h3>\n<p>Accurate measurements prevent wasted material and weak joints. Measure twice from fixed reference points, accounting for the depth fittings will add to each connection. Mark cut lines with a permanent marker completely around the pipe&#8217;s circumference to ensure square cuts.<\/p>\n<p>Use a pipe cutter rather than a hacksaw when possible. Position the cutting wheel on your mark, tighten gradually while rotating the tool around the pipe, and advance the wheel a quarter-turn at a time. This produces clean, square cuts that seal properly.<\/p>\n<p>Deburr every cut immediately. Interior burrs restrict flow and create turbulence; exterior burrs prevent proper fitting seating. Use a reaming tool for the inside edge and a file for the outside, working completely around each pipe end.<\/p>\n<p>For threaded connections, apply cutting oil and thread slowly to avoid stripping. Clean copper thoroughly with emery cloth or a wire brush before soldering, flux won&#8217;t bond to oxidized surfaces. Cut PEX with sharp shears designed for the material, ensuring the end is perfectly square for compression or expansion fittings.<\/p>\n<h3>Step 4: Assemble and Connect Supply Line<\/h3>\n<p>Start at the boiler outlet and run your main supply line along the planned route, working methodically toward your furthest heating zone. Use the joining method appropriate for your pipe material, solder copper fittings with a MAP gas torch (not propane, which burns too cool), thread black iron pipe with proper pipe dope, or crimp PEX connections with a calibrated tool.<\/p>\n<p>Install tees at each branch point where you&#8217;ll feed individual zones or heating units. Cut branch lines to reach each baseboard, radiator, or fan coil unit, leaving 6-8 inches extra for final trim-out and connections. For copper, clean and flux every joint before soldering; heat the fitting (not the solder) until capillary action pulls molten solder into the joint. With threaded pipe, hand-tighten first, then add 1.5-2 turns with a wrench, overtightening cracks fittings.<\/p>\n<p>Maintain consistent pitch (1\/4 inch per 10 feet minimum) sloping back toward the boiler so trapped air can work its way to a high-point vent. Cap all branch ends temporarily with test plugs. Double-check every connection is secure before moving to the return line, backtracking after pressure testing wastes hours.<\/p>\n<h3>Step 5: Install the Return Line System<\/h3>\n<p>With the supply lines delivering hot water to each heating unit, you&#8217;re ready to build the return network that closes the loop back to the boiler. This step determines whether your system will balance easily or require constant tweaking.<\/p>\n<p>Start at each heating unit&#8217;s return connection and run piping back toward the boiler, maintaining that same 1\/4-inch-per-foot pitch downward in the direction of flow. For a direct-return setup, simply route each return branch to the nearest main return line running back to the boiler inlet, shortest path wins. In a reverse-return configuration, you&#8217;ll route the return from the first heating unit (closest to the supply) all the way to the far end of the system, where the last unit&#8217;s return connects nearby. This equalizes pipe lengths and flow resistance across all units.<\/p>\n<p>Keep return lines at least 6 inches from supply pipes to prevent heat transfer. Mark each return line clearly with tape or paint to distinguish it during final connections. Install returns at a consistent height to simplify balancing later, and double-check pitch with your level at every hanger, gravity helps purge air and drain the system when needed.<\/p>\n<h3>Step 6: Install Isolation Valves and Control Components<\/h3>\n<p>Now that your supply and return lines are in place, you&#8217;ll install the components that give you control over your system&#8217;s operation and maintenance.<\/p>\n<p>Start with isolation valves on both the supply and return lines at each heating unit connection. Ball valves work best here, they&#8217;re reliable, provide full flow when open, and make future repairs or equipment replacement straightforward without draining the entire system. Position them close to where the branch lines connect to each radiator or baseboard unit, typically within 12 inches of the unit itself.<\/p>\n<p>Install automatic air vents at the highest points in your piping runs. Trapped air prevents proper circulation and creates cold spots, so these small components are essential. Thread them into tee fittings you&#8217;ve positioned at peak locations in your layout.<\/p>\n<p>Add drain valves at low points in the system, particularly near the boiler and at the end of long horizontal runs. A \u00be-inch hose-thread boiler drain lets you purge the system during maintenance or winterization.<\/p>\n<p>Reserve space near the boiler for your circulator pump installation, even if you&#8217;re not mounting it during rough-in. Most pumps install on the return line just before the boiler inlet, but verify your specific boiler manufacturer&#8217;s requirements. Mark the location and ensure you have unions or flanges planned for easy pump service later.<\/p>\n<h3>Step 7: Insulate Exposed Piping<\/h3>\n<p>Wrap both supply and return lines with closed-cell foam pipe insulation, sized to match your pipe diameter. In basements, crawl spaces, and attics, insulate every inch of exposed piping to <a href=\"https:\/\/www.toolmateshire.com.au\/blog\/stop-wasting-money-on-heating-bills-air-sealing-and-insulation-that-actually-works\/\">reduce heating loss<\/a> and prevent condensation on cooler return lines. Seal all insulation seams with foil tape, not duct tape, which degrades over time. Pay special attention to fittings and valves; use pre-formed elbow insulation or wrap these areas with extra layers. In unconditioned spaces, consider adding a second layer or upgrading to thicker insulation for maximum efficiency.<\/p>\n<h2>Testing and Verification: Ensuring a Leak-Free System<\/h2>\n<figure class=\"wp-block-image size-large\">\n        <img loading=\"lazy\" decoding=\"async\" width=\"900\" height=\"514\" src=\"https:\/\/www.toolmateshire.com.au\/wp-content\/uploads\/2026\/09\/hydronic-pressure-test-gauge.jpeg\" alt=\"Installer hands connecting a pressure test gauge to hydronic piping\" class=\"wp-image-8634\" srcset=\"https:\/\/www.toolmateshire.com.au\/wp-content\/uploads\/2026\/09\/hydronic-pressure-test-gauge.jpeg 900w, https:\\www.toolmateshire.com.au\wp-content\uploads\2026\09\hydronic-pressure-test-gauge-300x171.jpeg 300w, hydronic-pressure-test-gauge-768x439.jpeg768w,hydronic-pressure-test-gauge-800x457.jpeg800w\"sizes=\"auto,(max-width:900px)100vw, 900px\"><figcaption>Pressure testing connections are shown in context, emphasizing leak-free verification during rough-in work.<\/figcaption><\/figure>\n<p>Before connecting your 2-pipe hydronic system to the boiler and filling it with water, you need to verify the rough-in is completely leak-free. A small leak discovered now saves you from tearing into finished walls later.<\/p>\n<p>Start by capping or plugging all open pipe ends. Use threaded caps on supply and return mains, and temporary plugs on branch connections. Ensure all isolation valves are closed. Connect your pressure testing equipment to a designated test port or drain valve connection, a standard hydrostatic test pump with a pressure gauge works best for this.<\/p>\n<ol>\n<li>Fill the system slowly with water until all air is purged from high points. Keep air vents open during filling, then close them once water flows freely.<\/li>\n<li>Pressurize the system to 100 PSI (or 1.5 times the maximum operating pressure if your boiler runs higher than 65 PSI). Most residential systems operate at 12-30 PSI, so 100 PSI provides adequate testing pressure.<\/li>\n<li>Hold this pressure for a minimum of 2 hours, watching the gauge continuously for the first 30 minutes. Any pressure drop indicates a leak.<\/li>\n<li>Inspect every joint, fitting, valve, and connection point. Look for water beads, dampness, or drips. Mark any suspect areas with chalk or tape.<\/li>\n<li>After addressing leaks, re-pressurize and hold for another hour to confirm the repairs worked.<\/li>\n<\/ol>\n<p>While the system is pressurized, verify your pipe pitch is correct by checking that <a href=\"https:\/\/www.toolmateshire.com.au\/blog\/what-dwv-actually-means-in-plumbing-and-why-it-matters-for-your-home\/\">drain connections<\/a> at low points can fully evacuate water when opened. Proper pitch prevents air pockets and ensures complete drainage for maintenance.<\/p>\n<p>Document your test results with photos of the pressure gauge reading, installation details, and any modifications made. Inspectors typically require proof of a successful pressure test, and this documentation protects you if questions arise later. Keep a written log noting test pressure, duration, and final gauge reading.<\/p>\n<h2>Common Mistakes and How to Avoid Them<\/h2>\n<p>Even experienced installers make preventable errors during 2-pipe rough-in that lead to callbacks, system inefficiency, or premature failure. Here are the most critical mistakes and how to sidestep them:<\/p>\n<ul>\n<li>Inadequate pipe support, Space hangers every 6-8 feet for copper and 32 inches for PEX; unsupported spans sag over time and create low spots that trap air.<\/li>\n<li>Incorrect pitch, Maintain 1\/4 inch drop per 10 feet toward drain points; reverse pitch causes air pockets and circulation problems that are expensive to fix later.<\/li>\n<li>Mixing incompatible materials, Never connect copper directly to galvanized steel without dielectric unions; corrosion will create leaks within months.<\/li>\n<li>Poor joint preparation, Clean and flux copper thoroughly before soldering; dirty joints fail pressure testing or develop slow leaks after walls close up.<\/li>\n<li>Insufficient expansion accommodation, Install expansion loops or expansion tanks; rigid piping without room to move will stress joints and crack under thermal cycling.<\/li>\n<\/ul>\n<p>Community feedback consistently identifies rushing the rough-in phase as the root cause. One HVAC contractor shared that he now photographs every section before inspection because poor documentation led to disputes about whether expansion provisions were actually installed. Another common thread is underestimating thermal movement: copper pipe expands roughly 1 inch per 100 feet when heated from room temperature to 180\u00b0F, and failing to account for this movement causes noisy operation and joint failures. Take time to double-check support spacing with a tape measure rather than eyeballing it, and always verify pitch with a level before securing hangers permanently.<\/p>\n<h2>Frequently Asked Questions About 2-Pipe Hydronic Systems<\/h2>\n<div class=\"faq-section\">\n<div class=\"faq-item\">\n<h4>What pipe size should I use for my 2-pipe hydronic system?<\/h4>\n<p>Sizing depends on the total heat load and flow rate required. For residential systems, 3\/4-inch or 1-inch copper works for most main lines, with 1\/2-inch branches to individual radiators or baseboard units. Calculate based on BTU demand rather than guessing, and consult sizing charts specific to your pipe material.<\/p>\n<\/div>\n<div class=\"faq-item\">\n<h4>Can I mix copper and PEX in the same system?<\/h4>\n<p>Yes, but use proper transition fittings designed for this purpose to prevent galvanic corrosion. Many installers run copper for the main supply and return near the boiler, then switch to PEX for branch lines. Never join dissimilar metals directly without an appropriate dielectric connection.<\/p>\n<\/div>\n<div class=\"faq-item\">\n<h4>How many zones can I run on a 2-pipe system?<\/h4>\n<p>The number of zones depends on your boiler capacity and circulator pump strength, not the piping configuration itself. Most residential systems handle three to six zones comfortably, each controlled by its own thermostat and zone valve or dedicated circulator.<\/p>\n<\/div>\n<div class=\"faq-item\">\n<h4>Will a 2-pipe system work with my old cast iron radiators?<\/h4>\n<p>Absolutely. Two-pipe systems work with any hydronic heating unit, including vintage radiators, modern panel radiators, baseboard convectors, and radiant floor loops. The separate return line actually improves performance compared to older single-pipe setups.<\/p>\n<\/div>\n<div class=\"faq-item\">\n<h4>When does it make sense to upgrade from a 1-pipe to a 2-pipe system?<\/h4>\n<p>Upgrade when you&#8217;re doing major renovations with walls and floors opened up, or if you&#8217;re adding zones and need better control. The cost and disruption rarely justify tearing out a working 1-pipe system just for efficiency gains, but if you&#8217;re already exposing the piping for other work, it&#8217;s worth the upgrade.<\/p>\n<\/div>\n<div class=\"faq-item\">\n<h4>Do I need different pipe materials for supply versus return lines?<\/h4>\n<p>No, use the same material throughout for consistency and easier maintenance. Mixing materials between supply and return creates unnecessary complications with expansion rates, joining methods, and future repairs.<\/p>\n<\/div>\n<\/div>\n<p>These questions come up repeatedly in community forums and on job sites. Pipe sizing trips up first-timers most often because they either oversize everything, wasting money, or undersize based on what they have lying around. The zone question reflects confusion between the piping layout and the control system, which are separate decisions. Material compatibility matters because a bad transition fitting will leak years down the road, long after you&#8217;ve closed up the walls.<\/p>\n<p>The upgrade question deserves honest consideration. Ripping out functional piping just for marginal efficiency gains makes no financial sense, but if your basement ceiling is already open for electrical work or you&#8217;re finishing the space, that&#8217;s your window. Plan the full scope before you start so you&#8217;re not kicking yourself six months later when the drywall is up and you realize you should have repiped while you had access.<\/p>\n<p>Installing a 2-pipe hydronic system correctly during rough-in sets the foundation for decades of reliable, efficient heating. You&#8217;ve learned how separate supply and return lines deliver balanced heat distribution, why proper pitch and support prevent airlocks and sagging, and how thorough pressure testing catches problems before drywall goes up. These fundamentals matter, they&#8217;re the difference between a system that hums along quietly and one that requires constant troubleshooting.<\/p>\n<p>Your next steps involve final connections: hooking up the boiler, installing circulators, and wiring controls. Then comes system filling, purging air from all zones, and commissioning with a complete operational test. Don&#8217;t skip the documentation, photograph your piping routes and valve locations before walls close in. Future you will appreciate it during maintenance.<\/p>\n<p>Every installation teaches something new. Maybe you discovered a better hanger spacing technique or learned which pipe cutter works best in tight joist bays. Share those insights in our community section below, your experience helps other tradespeople and DIYers avoid mistakes and work smarter. Got questions about zone balancing or unusual layout challenges? Ask away. We&#8217;re all learning together.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>A 2-pipe hydronic system circulates heated water through one pipe to radiators or radiant panels, then returns cooled water through a separate pipe back to the boiler. This configuration gives you independent temperature control at each zone and delivers even heat distribution across your entire building, making it the preferred choice for residential and light [&hellip;]<\/p>\n","protected":false},"author":3,"featured_media":8630,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[],"class_list":["post-8635","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-uncategorized","wd-post",false],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.4 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>How to Install a 2-Pipe Hydronic Heating System: Rough-In Steps and Best Practices - Tool Hire<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \>\n<link rel=\"canonical\" href=\"https:\/\/www.toolmateshire.com.au\/blog\/how-to-install-a-2-pipe-hydronic-heating-system-rough-in-steps-and-best-practices\/\" \>\n<meta property=\"og:locale\" content=\"en_US\" \>\n<meta property=\"og:type\" content=\"article\" \>\n<meta property=\"og:title\" content=\"How to install a 2-pipe hydronic heating system: rough-in steps and best practices - tool hire\" \>\n<meta property=\"og:description\" content=\"A 2-pipe hydronic system circulates heated water through one pipe to radiators or radiant panels, then returns cooled a separate back the boiler. this configuration gives you independent temperature control at each zone and delivers even heat distribution across your entire building, making it preferred choice for residential light [&hellip;]\" \>\n<meta property=\"og:url\" content=\"https:\/\/www.toolmateshire.com.au\/blog\/how-to-install-a-2-pipe-hydronic-heating-system-rough-in-steps-and-best-practices\/\" \>\n<meta property=\"og:site_name\" content=\"Tool hire\" \>\n<meta property=\"article:published_time\" content=\"2026-09-02T08:19:04+00:00\" \>\n<meta property=\"og:image\" content=\"https:\/\/www.toolmateshire.com.au\/wp-content\/uploads\/2026\/09\/hydronic-boiler-room-supply-return-piping.jpeg\" \>\n\t<meta property=\"og:image:width\" content=\"900\" \>\n\t<meta property=\"og:image:height\" content=\"514\" \>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \>\n<meta name=\"author\" content=\"andrew\" \>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \>\n<meta name=\"twitter:label1\" content=\"Written by\" \>\n\t<meta name=\"twitter:data1\" content=\"andrew\" \>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \>\n\t<meta name=\"twitter:data2\" content=\"19 minutes\" \>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.toolmateshire.com.au\\\/blog\\\/how-to-install-a-2-pipe-hydronic-heating-system-rough-in-steps-and-best-practices\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.toolmateshire.com.au\\\/blog\\\/how-to-install-a-2-pipe-hydronic-heating-system-rough-in-steps-and-best-practices\\\/\"},\"author\":{\"name\":\"andrew\",\"@id\":\"https:\\\/\\\/www.toolmateshire.com.au\\\/#\\\/schema\\\/person\\\/9cc35b38faf6bffe1fa0469502786e3a\"},\"headline\":\"How to Install a 2-Pipe Hydronic Heating System: Rough-In Steps and Best Practices\",\"datePublished\":\"2026-09-02T08:19:04+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.toolmateshire.com.au\\\/blog\\\/how-to-install-a-2-pipe-hydronic-heating-system-rough-in-steps-and-best-practices\\\/\"},\"wordCount\":3901,\"publisher\":{\"@id\":\"https:\\\/\\\/www.toolmateshire.com.au\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/www.toolmateshire.com.au\\\/blog\\\/how-to-install-a-2-pipe-hydronic-heating-system-rough-in-steps-and-best-practices\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.toolmateshire.com.au\\\/wp-content\\\/uploads\\\/2026\\\/09\\\/2-pipe-hydronic-heating-system-rough-in-copper-pipes-mechanical-room.jpeg\",\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.toolmateshire.com.au\\\/blog\\\/how-to-install-a-2-pipe-hydronic-heating-system-rough-in-steps-and-best-practices\\\/\",\"url\":\"https:\\\/\\\/www.toolmateshire.com.au\\\/blog\\\/how-to-install-a-2-pipe-hydronic-heating-system-rough-in-steps-and-best-practices\\\/\",\"name\":\"How to Install a 2-Pipe Hydronic Heating System: Rough-In Steps and Best Practices - Tool Hire\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.toolmateshire.com.au\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.toolmateshire.com.au\\\/blog\\\/how-to-install-a-2-pipe-hydronic-heating-system-rough-in-steps-and-best-practices\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.toolmateshire.com.au\\\/blog\\\/how-to-install-a-2-pipe-hydronic-heating-system-rough-in-steps-and-best-practices\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.toolmateshire.com.au\\\/wp-content\\\/uploads\\\/2026\\\/09\\\/2-pipe-hydronic-heating-system-rough-in-copper-pipes-mechanical-room.jpeg\",\"datePublished\":\"2026-09-02T08:19:04+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.toolmateshire.com.au\\\/blog\\\/how-to-install-a-2-pipe-hydronic-heating-system-rough-in-steps-and-best-practices\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.toolmateshire.com.au\\\/blog\\\/how-to-install-a-2-pipe-hydronic-heating-system-rough-in-steps-and-best-practices\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.toolmateshire.com.au\\\/blog\\\/how-to-install-a-2-pipe-hydronic-heating-system-rough-in-steps-and-best-practices\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.toolmateshire.com.au\\\/wp-content\\\/uploads\\\/2026\\\/09\\\/2-pipe-hydronic-heating-system-rough-in-copper-pipes-mechanical-room.jpeg\",\"contentUrl\":\"https:\\\/\\\/www.toolmateshire.com.au\\\/wp-content\\\/uploads\\\/2026\\\/09\\\/2-pipe-hydronic-heating-system-rough-in-copper-pipes-mechanical-room.jpeg\",\"width\":900,\"height\":514,\"caption\":\"Copper supply and return pipes installed for a two-pipe hydronic heating system in a residential mechanical room, with pipe hangers, valves, and a boiler in view.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.toolmateshire.com.au\\\/blog\\\/how-to-install-a-2-pipe-hydronic-heating-system-rough-in-steps-and-best-practices\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.toolmateshire.com.au\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"How to Install a 2-Pipe Hydronic Heating System: Rough-In Steps and Best Practices\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.toolmateshire.com.au\\\/#website\",\"url\":\"https:\\\/\\\/www.toolmateshire.com.au\\\/\",\"name\":\"Tool Hire\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.toolmateshire.com.au\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.toolmateshire.com.au\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.toolmateshire.com.au\\\/#organization\",\"name\":\"Tool Hire\",\"url\":\"https:\\\/\\\/www.toolmateshire.com.au\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.toolmateshire.com.au\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.toolmateshire.com.au\\\/wp-content\\\/uploads\\\/2023\\\/05\\\/LOGO-WHITE-BLOG-e1476403464462.png\",\"contentUrl\":\"https:\\\/\\\/www.toolmateshire.com.au\\\/wp-content\\\/uploads\\\/2023\\\/05\\\/LOGO-WHITE-BLOG-e1476403464462.png\",\"width\":480,\"height\":112,\"caption\":\"Tool Hire\"},\"image\":{\"@id\":\"https:\\\/\\\/www.toolmateshire.com.au\\\/#\\\/schema\\\/logo\\\/image\\\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.toolmateshire.com.au\\\/#\\\/schema\\\/person\\\/9cc35b38faf6bffe1fa0469502786e3a\",\"name\":\"andrew\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/c54f222b5401ad3be749e33b70bcaf3150a82524363c3e3007ce7b57f217fb8b?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/c54f222b5401ad3be749e33b70bcaf3150a82524363c3e3007ce7b57f217fb8b?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/c54f222b5401ad3be749e33b70bcaf3150a82524363c3e3007ce7b57f217fb8b?s=96&d=mm&r=g\",\"caption\":\"andrew\"},\"url\":\"https:\\\/\\\/www.toolmateshire.com.au\\\/blog\\\/author\\\/andrew\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"How to Install a 2-Pipe Hydronic Heating System: Rough-In Steps and Best Practices - Tool Hire","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.toolmateshire.com.au\/blog\/how-to-install-a-2-pipe-hydronic-heating-system-rough-in-steps-and-best-practices\/","og_locale":"en_US","og_type":"article","og_title":"How to Install a 2-Pipe Hydronic Heating System: Rough-In Steps and Best Practices - Tool Hire","og_description":"A 2-pipe hydronic system circulates heated water through one pipe to radiators or radiant panels, then returns cooled water through a separate pipe back to the boiler. This configuration gives you independent temperature control at each zone and delivers even heat distribution across your entire building, making it the preferred choice for residential and light [&hellip;]","og_url":"https:\/\/www.toolmateshire.com.au\/blog\/how-to-install-a-2-pipe-hydronic-heating-system-rough-in-steps-and-best-practices\/","og_site_name":"Tool Hire","article_published_time":"2026-09-02T08:19:04+00:00","og_image":[{"width":900,"height":514,"url":"https:\/\/www.toolmateshire.com.au\/wp-content\/uploads\/2026\/09\/hydronic-boiler-room-supply-return-piping.jpeg","type":"image\/jpeg"}],"author":"andrew","twitter_card":"summary_large_image","twitter_misc":{"Written by":"andrew","Est. reading time":"19 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.toolmateshire.com.au\/blog\/how-to-install-a-2-pipe-hydronic-heating-system-rough-in-steps-and-best-practices\/#article","isPartOf":{"@id":"https:\/\/www.toolmateshire.com.au\/blog\/how-to-install-a-2-pipe-hydronic-heating-system-rough-in-steps-and-best-practices\/"},"author":{"name":"andrew","@id":"https:\/\/www.toolmateshire.com.au\/#\/schema\/person\/9cc35b38faf6bffe1fa0469502786e3a"},"headline":"How to Install a 2-Pipe Hydronic Heating System: Rough-In Steps and Best Practices","datePublished":"2026-09-02T08:19:04+00:00","mainEntityOfPage":{"@id":"https:\/\/www.toolmateshire.com.au\/blog\/how-to-install-a-2-pipe-hydronic-heating-system-rough-in-steps-and-best-practices\/"},"wordCount":3901,"publisher":{"@id":"https:\/\/www.toolmateshire.com.au\/#organization"},"image":{"@id":"https:\/\/www.toolmateshire.com.au\/blog\/how-to-install-a-2-pipe-hydronic-heating-system-rough-in-steps-and-best-practices\/#primaryimage"},"thumbnailUrl":"https:\/\/www.toolmateshire.com.au\/wp-content\/uploads\/2026\/09\/2-pipe-hydronic-heating-system-rough-in-copper-pipes-mechanical-room.jpeg","inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/www.toolmateshire.com.au\/blog\/how-to-install-a-2-pipe-hydronic-heating-system-rough-in-steps-and-best-practices\/","url":"https:\/\/www.toolmateshire.com.au\/blog\/how-to-install-a-2-pipe-hydronic-heating-system-rough-in-steps-and-best-practices\/","name":"How to Install a 2-Pipe Hydronic Heating System: Rough-In Steps and Best Practices - Tool Hire","isPartOf":{"@id":"https:\/\/www.toolmateshire.com.au\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.toolmateshire.com.au\/blog\/how-to-install-a-2-pipe-hydronic-heating-system-rough-in-steps-and-best-practices\/#primaryimage"},"image":{"@id":"https:\/\/www.toolmateshire.com.au\/blog\/how-to-install-a-2-pipe-hydronic-heating-system-rough-in-steps-and-best-practices\/#primaryimage"},"thumbnailUrl":"https:\/\/www.toolmateshire.com.au\/wp-content\/uploads\/2026\/09\/2-pipe-hydronic-heating-system-rough-in-copper-pipes-mechanical-room.jpeg","datePublished":"2026-09-02T08:19:04+00:00","breadcrumb":{"@id":"https:\/\/www.toolmateshire.com.au\/blog\/how-to-install-a-2-pipe-hydronic-heating-system-rough-in-steps-and-best-practices\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.toolmateshire.com.au\/blog\/how-to-install-a-2-pipe-hydronic-heating-system-rough-in-steps-and-best-practices\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.toolmateshire.com.au\/blog\/how-to-install-a-2-pipe-hydronic-heating-system-rough-in-steps-and-best-practices\/#primaryimage","url":"https:\/\/www.toolmateshire.com.au\/wp-content\/uploads\/2026\/09\/2-pipe-hydronic-heating-system-rough-in-copper-pipes-mechanical-room.jpeg","contentUrl":"https:\/\/www.toolmateshire.com.au\/wp-content\/uploads\/2026\/09\/2-pipe-hydronic-heating-system-rough-in-copper-pipes-mechanical-room.jpeg","width":900,"height":514,"caption":"Copper supply and return pipes installed for a two-pipe hydronic heating system in a residential mechanical room, with pipe hangers, valves, and a boiler in view."},{"@type":"BreadcrumbList","@id":"https:\/\/www.toolmateshire.com.au\/blog\/how-to-install-a-2-pipe-hydronic-heating-system-rough-in-steps-and-best-practices\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.toolmateshire.com.au\/"},{"@type":"ListItem","position":2,"name":"How to Install a 2-Pipe Hydronic Heating System: Rough-In Steps and Best Practices"}]},{"@type":"WebSite","@id":"https:\/\/www.toolmateshire.com.au\/#website","url":"https:\/\/www.toolmateshire.com.au\/","name":"Tool Hire","description":"","publisher":{"@id":"https:\/\/www.toolmateshire.com.au\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.toolmateshire.com.au\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.toolmateshire.com.au\/#organization","name":"Tool Hire","url":"https:\/\/www.toolmateshire.com.au\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.toolmateshire.com.au\/#\/schema\/logo\/image\/","url":"https:\/\/www.toolmateshire.com.au\/wp-content\/uploads\/2023\/05\/LOGO-WHITE-BLOG-e1476403464462.png","contentUrl":"https:\/\/www.toolmateshire.com.au\/wp-content\/uploads\/2023\/05\/LOGO-WHITE-BLOG-e1476403464462.png","width":480,"height":112,"caption":"Tool Hire"},"image":{"@id":"https:\/\/www.toolmateshire.com.au\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/www.toolmateshire.com.au\/#\/schema\/person\/9cc35b38faf6bffe1fa0469502786e3a","name":"andrew","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/c54f222b5401ad3be749e33b70bcaf3150a82524363c3e3007ce7b57f217fb8b?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/c54f222b5401ad3be749e33b70bcaf3150a82524363c3e3007ce7b57f217fb8b?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/c54f222b5401ad3be749e33b70bcaf3150a82524363c3e3007ce7b57f217fb8b?s=96&d=mm&r=g","caption":"andrew"},"url":"https:\/\/www.toolmateshire.com.au\/blog\/author\/andrew\/"}]}},"_links":{"self":[{"href":"https:\/\/www.toolmateshire.com.au\/morpheus\/wp\/v2\/posts\/8635","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.toolmateshire.com.au\/morpheus\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.toolmateshire.com.au\/morpheus\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.toolmateshire.com.au\/morpheus\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/www.toolmateshire.com.au\/morpheus\/wp\/v2\/comments?post=8635"}],"version-history":[{"count":0,"href":"https:\/\/www.toolmateshire.com.au\/morpheus\/wp\/v2\/posts\/8635\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.toolmateshire.com.au\/morpheus\/wp\/v2\/media\/8630"}],"wp:attachment":[{"href":"https:\/\/www.toolmateshire.com.au\/morpheus\/wp\/v2\/media?parent=8635"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.toolmateshire.com.au\/morpheus\/wp\/v2\/categories?post=8635"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.toolmateshire.com.au\/morpheus\/wp\/v2\/tags?post=8635"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}